CIVE 83Project Management and Control

Faculty
Engineering
Last listed
1966–67

No longer offered. It’s in Waterloo’s scanned calendars from 1963–64 to 1966–67; the 1995–96 to 2023–24 calendars are on ucalendar.

Separation of planning and scheduling functions, arrow diagramming, C.P.M. and P.E.R.T., delivery and capital restraints, calendar dating and scheduling, resource allocation of equipment and manpower, introduction to linear programming. Project work.

As printed in the 1966–67 calendar, read by OCR; the scanned page is the original.

Check it elsewhere

    In the scanned calendars

    How it read in each calendar from 1963–64 to 1966–67, newest first. The text is OCR of the scanned pages; years whose wording matches are shown once, from the clearest scan. Each year links to its page on uwloo and to that page of the scanned PDF.

    1966–67 1 calendar

    Separation of planning and scheduling functions, arrow diagramming, C.P.M. and P.E.R.T., delivery and capital restraints, calendar dating and scheduling, resource allocation of equipment and manpower, introduction to linear programming. Project work.

    1963–64 to 1965–66 3 calendars

    Titled Project Management.

    Separation of planning and scheduling functions, traditional methods, arrow diagramming, calculation of earliest and latest event times, design, delivery, and capital restraints, critical path determination, scheduling and calendar dating, the data flow cycle, linear programming and operational analysis. 3 lectures, one term.