uwloo

ECE 6618PDMedium and High Voltage Power Cables

Units
0.50
Level
Graduate
Faculty
Engineering
Subject
Electrical and Computer Engineering

When it runs

  1. F24
  2. W25
  3. S25
  4. F25
  5. W26
  6. S26
  7. F26
  8. W27
  9. S27

Ran in 1 of the last 7 terms. Winter 2027: scheduled, 1 lecture section. Spring 2027: schedule not out yet.

Vast urbanization and increasing pressure to meet high demand in power delivery have resulted in a significant growth in underground cable network. In addtiion, underground cables being a critical asset group, any outages due to their failure will result in considerable service delivery and economic impact on the operation of distribution networks. Understand the basic dielectric theory, material properties and design details of underground cables and their accessories. Understand typical failure modes and their early detection of underground cable and their accessories. Discuss in detail various off-line and on-line diagnostic tests for condition monitoring of underground cables.

Prerequisites

Antirequisites

None listed.

Leads to

No course lists it as a requisite.

Winter 2027 sections

Enrolment from UW Open Data, which can trail Quest by up to two days. Instructors and rooms: Schedule of Classes.
SectionClassEnrolledMeets
LEC 00177730 / 35Online or by arrangement

Check it elsewhere for Fall 2026

Calendar versions

Graduate Calendar