uwloo

CO 456AScheduling 1 N

Faculty
Mathematics
Last listed
1978–79

No longer offered. It’s in Waterloo’s scanned calendars from 1976–77 to 1978–79; the 1995–96 to 2023–24 calendars are on ucalendar.

Single machine job shops, parallel machines, flow-shop scheduling, the general m/n job shop. Capital budgeting, distribution problems occurring in scheduling trucks, trains, and in warehouse movements. 2 hours lectures, one term.

As printed in the 1976–77 to 1978–79 calendars, read by OCR; the scanned page is the original.

Requirements, as last listed

Prerequisites: C&O 352 recommended.

Check it elsewhere

    In the scanned calendars

    How it read in each calendar from 1976–77 to 1978–79, newest first. The text is OCR of the scanned pages; years whose wording matches are shown once, from the clearest scan. Each year links to its page on uwloo and to that page of the scanned PDF.

    1976–77 to 1978–79 3 calendars

    Single machine job shops, parallel machines, flow-shop scheduling, the general m/n job shop. Capital budgeting, distribution problems occurring in scheduling trucks, trains, and in warehouse movements.

    2 hours lectures, one term.

    Prerequisites: C&O 352 recommended.