AE 392Economics and Life Cycle Cost Analysis
- Units
- 0.50
- Faculty
- Engineering
- Subject
- Architectural Engineering
When it runs
- F24
- W25
- S25
- F25
- W26
- S26
- F26
- W27
- S27
Ran in 6 of the last 7 terms. Winter 2027: scheduled. Spring 2027: schedule not out yet.
Project financing, life-cycle cost analysis, time value of money, sensitivity analyses, tax, financial implications of infrastructure projects, quantitative decision-making, financial aspects of a business plan.
Prerequisites
- Complete all of the following
- Must have completed the following:
- MATH116 - Calculus 1 for Engineering (0.50)
- Complete 1 of the following
- Complete all of the following
- Students must be in level 3B or higher
- Enrolled in H-Architectural Engineering
- Complete all of the following
- Students must be in level 2B or higher
- Enrolled in H-Civil Engineering
- Complete all of the following
- Students must be in level 3A or higher
- Enrolled in H-Environmental Engineering, or H-Geological Engineering
- Complete all of the following
- Must have completed the following:
Antirequisites
None listed.
Leads to
Check it elsewhere for Fall 2026
- Undergraduate Calendar, 2026–27The official entry
- Requirements for Fall 2026Waterloo’s requisite checker
- Schedule of Classes, Fall 2026Instructors, rooms, live seats
- Quest Class SearchWhere you enrol
- Course outlinesSyllabi from past terms (UW login)
- UW FlowStudent ratings and reviews
- WClassesPast sections back to 2004, and who taught them